ITAC Assessment: AS0518
ITAC logo
ITAC Assessment: AS0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Recycled Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 153,969
ft2
Annual Production 12,300,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,450,061 30,838,665
kWh
Electricity Demand $785,019 86,611
kW-mo/yr
Electricity Fees $110,243 -
TOTAL YEARLY COSTS $2,345,323
RECOMMENDED SAVINGS* $92,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $29,267 $226,584 $(-18,733.0)
(-398,571)
kWh
- $36,000
-
gal
- $12,000
02 2.4221: Install compressor air intakes in coolest locations $22,746 $3,707 $17,987
382,701
kWh
$4,759
-
kW-mo/yr
- - -
03 2.7261: Install timers and/or thermostats $21,371 $9,286 $19,622
417,498
kWh
$1,749
-
kW-mo/yr
- - -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $16,536 $3,537 $11,560
245,943
kWh
$4,976
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,420 $3,762 $1,240
26,419
kWh
$504
-
kW-mo/yr
- $676 -
06 2.3135: Schedule routine maintenance during non-operating periods $391 $1,619 - $391
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $92,731 $248,495 $31,676
673,990
kWh
$12,379
-
kW-mo/yr
$36,000
-
gal
$676 $12,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs