Assessment Year | 1990 |
---|---|
Principal Product | SWEAT SHIRTS & JACKETS |
NAICS |
n/a
|
SIC | 2329: Men's and Boys' Clothing, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
n/a
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,834 | 711,899 |
kWh
|
$0.074 |
Natural Gas | $23,926 | 4,150 |
MMBtu
|
$5.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,831 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $1,398 | $4,800 | - |
$1,398
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,555 | $390 |
$4,555
61,547
kWh
|
- | - | |
03 | 2.7123: Keep lamps and reflectors clean | $2,724 | $11,289 |
$2,494
33,705
kWh
|
- | $230 | |
04 | 2.6214: Shut off pilots in standby equipment | $760 | - | - |
$760
-
MMBtu
|
- | |
05 | 2.4131: Size electric motors for peak operating efficiency | $1,475 | $1,140 |
$1,475
19,930
kWh
|
- | - | |
06 | 2.6232: Install set-back timers | $1,258 | - |
$1,258
16,999
kWh
|
- | - | |
07 | 2.4227: Use compressor air filters | $716 | $50 |
$716
9,672
kWh
|
- | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $195 | - |
$195
2,638
kWh
|
- | - | |
09 | 2.4312: Improve lubrication practices | $152 | - |
$152
2,052
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $347 | $264 |
$347
4,689
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,580 | $17,933 |
$11,192
151,232
kWh
|
$2,158
-
MMBtu
|
$230 | ||
TOTAL IMPLEMENTED | $7,831 | $704 |
$7,071
95,545
kWh
|
$760
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs