ITAC Assessment: AS0110
ITAC logo
ITAC Assessment: AS0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Steel Fabrication
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 16
Plant Area 4,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,850 138,042
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $2,711 $8,203 $2,711
29,015
kWh
02 2.7134: Use photocell controls $142 $450 $142
1,465
kWh
03 2.7134: Use photocell controls $646 $90 $646
7,034
kWh
04 2.6232: Install set-back timers $676 $100 $676
7,327
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $205 $400 $205
2,345
kWh
06 2.4313: Provide proper maintenance of motor driven equipment $151 $758 $151
1,758
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $965 $400 $965
10,258
kWh
TOTAL RECOMMENDED $5,496 $10,401 $5,496
59,202
kWh
TOTAL IMPLEMENTED $4,494 $9,153 $4,494
48,065
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs