Assessment Year | 2016 |
---|---|
Principal Product | Textiles |
NAICS | 315210: Cut and Sew Apparel Contractors |
SIC | 2395: Pleating, Decorative and Novelty Stitching, and Tucking for the Trade |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
60,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 5,902
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $189,432 | 2,808,960 |
kWh
|
$0.067 | |
Electricity Demand | $122,820 | 6,861 |
kW-mo/yr
|
$17.90 | |
Electricity Fees | $13,896 | - |
|
- | |
Natural Gas | $268,209 | 47,631 |
MMBtu
|
$5.63 | |
Waste Disposal Costs | |||||
Water Usage | $214,071 | 30,581 |
Tgal
|
$7.00 | |
Water Disposal | $92,880 | 17,525 |
Tgal
|
$5.30 | |
TOTAL YEARLY COSTS | $901,308 | ||||
RECOMMENDED SAVINGS* | $118,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $54,362 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $4,099 | $4,200 | - | - |
$4,099
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,895 | $16,550 |
$7,706
115,020
kWh
|
$4,189
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,405 | $3,610 |
$1,564
23,350
kWh
|
$841
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,603 | $5,470 |
$1,225
18,290
kWh
|
$1,378
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,000 | $13,010 |
$2,688
40,115
kWh
|
$3,312
-
kW-mo/yr
|
- | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $8,529 | $21,200 | - | - |
$8,529
-
MMBtu
|
|
07 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $33,048 | $85,000 | - | - |
$33,048
-
MMBtu
|
|
08 | 2.2437: Recover waste heat from equipment | $40,226 | $107,360 | - | - |
$40,226
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,556 | $36,400 |
$5,549
82,820
kWh
|
$3,007
-
kW-mo/yr
|
- | |
10 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $816 | $4,560 | - | - |
$816
-
MMBtu
|
|
TOTAL RECOMMENDED | $118,177 | $297,360 |
$18,732
279,595
kWh
|
$12,727
-
kW-mo/yr
|
$86,718
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,362 | $124,590 |
$11,619
173,425
kWh
|
$8,879
-
kW-mo/yr
|
$33,864
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs