ITAC Assessment: MZ0109
ITAC logo
ITAC Assessment: MZ0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 5122: Drugs, Drug Proprietaries, and Druggists' Sundries
Sales Range $100
M
to 500
M
# of Employees 259
Plant Area 494,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,684 2,929,200
kWh
Electricity Demand $23,388 7,619
kW-mo/yr
Natural Gas $25,937 3,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $19,287 $11,200 $5,573
69,660
kWh
$713
-
kW-mo/yr
$13,001
-
MMBtu
02 2.7496: Install partitions to reduce size of conditioned space $14,164 $10,000 $13,930
190,821
kWh
$234
-
kW-mo/yr
-
03 2.2622: Replace existing chiller with high efficiency model $50,867 $155,000 $27,952
349,410
kWh
$22,915
-
kW-mo/yr
-
TOTAL RECOMMENDED $84,317 $176,200 $47,455
609,891
kWh
$23,861
-
kW-mo/yr
$13,001
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs