Assessment Year | 2019 |
---|---|
Principal Product | Pipes and Conduits |
NAICS | 335932: Noncurrent-Carrying Wiring Device Manufacturing |
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
257,042
ft2
|
Annual Production | 4,495,296
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $607,910 | 13,927,200 |
kWh
|
$0.044 | |
Electricity Demand | $122,257 | 26,710 |
kW-mo/yr
|
$4.58 | |
Natural Gas | $578,749 | 144,381 |
MMBtu
|
$4.01 | |
Waste Disposal Costs | |||||
Water Usage | $26,415 | 16,213 |
Tgal
|
$1.63 | |
Water Disposal | $29,182 | 16,213 |
Tgal
|
$1.80 | |
TOTAL YEARLY COSTS | $1,364,513 | ||||
RECOMMENDED SAVINGS* | $245,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $181,746 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3125: Use distillation, evaporation to remove contaminants | $119,892 | $51,560 | - | - | - | - | - | $119,892 | |
02 | 2.2515: Use optimum thickness insulation | $45,228 | $60,000 | - | - |
$45,228
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,405 | $3,200 |
$20,258
471,120
kWh
|
$4,147
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,374 | $16,645 |
$12,023
275,759
kWh
|
$1,768
-
kW-mo/yr
|
- | - | $5,583 | - | |
05 | 2.7261: Install timers and/or thermostats | $14,353 | $500 |
$14,353
329,196
kWh
|
- | - | - | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $9,767 | $1,910 | - | - | - |
$9,767
-
Tgal
|
- | - | |
07 | 2.4224: Upgrade controls on compressors | $7,188 | $600 |
$5,981
137,173
kWh
|
$1,207
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2515: Use optimum thickness insulation | $3,722 | $10,752 | - | - |
$3,722
-
MMBtu
|
- | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,042 | $640 |
$1,042
23,899
kWh
|
- | - | - | - | - | |
10 | 2.6218: Turn off equipment when not in use | $792 | $40 |
$792
18,165
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $245,764 | $145,847 |
$54,449
1,255,312
kWh
|
$7,122
-
kW-mo/yr
|
$48,950
-
MMBtu
|
$9,767
-
Tgal
|
$5,583 | $119,892 | ||
TOTAL IMPLEMENTED | $181,746 | $82,657 |
$46,634
1,076,075
kWh
|
$5,915
-
kW-mo/yr
|
$3,722
-
MMBtu
|
- | $5,583 | $119,892 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs