ITAC Assessment: TT0224
ITAC logo
ITAC Assessment: TT0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pipes and Conduits
NAICS 335932: Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 257,042
ft2
Annual Production 4,495,296
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,910 13,927,200
kWh
Electricity Demand $122,257 26,710
kW-mo/yr
Natural Gas $578,749 144,381
MMBtu
Waste Disposal Costs
Water Usage $26,415 16,213
Tgal
Water Disposal $29,182 16,213
Tgal
TOTAL YEARLY COSTS $1,364,513
RECOMMENDED SAVINGS* $245,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $181,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.3125: Use distillation, evaporation to remove contaminants $119,892 $51,560 - - - - - $119,892
02 2.2515: Use optimum thickness insulation $45,228 $60,000 - - $45,228
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,405 $3,200 $20,258
471,120
kWh
$4,147
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,374 $16,645 $12,023
275,759
kWh
$1,768
-
kW-mo/yr
- - $5,583 -
05 2.7261: Install timers and/or thermostats $14,353 $500 $14,353
329,196
kWh
- - - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $9,767 $1,910 - - - $9,767
-
Tgal
- -
07 2.4224: Upgrade controls on compressors $7,188 $600 $5,981
137,173
kWh
$1,207
-
kW-mo/yr
- - - -
08 2.2515: Use optimum thickness insulation $3,722 $10,752 - - $3,722
-
MMBtu
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,042 $640 $1,042
23,899
kWh
- - - - -
10 2.6218: Turn off equipment when not in use $792 $40 $792
18,165
kWh
- - - - -
TOTAL RECOMMENDED $245,764 $145,847 $54,449
1,255,312
kWh
$7,122
-
kW-mo/yr
$48,950
-
MMBtu
$9,767
-
Tgal
$5,583 $119,892
TOTAL IMPLEMENTED $181,746 $82,657 $46,634
1,076,075
kWh
$5,915
-
kW-mo/yr
$3,722
-
MMBtu
- $5,583 $119,892
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs