ITAC Assessment: IC0318
ITAC logo
ITAC Assessment: IC0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 66
Plant Area 3,090,929
ft2
Annual Production 7,304,850
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $954,069 14,919,671
kWh
Electricity Demand $92,857 28,892
kW-mo/yr
Electricity Fees $229,530 -
Natural Gas $149,278 13,150
MMBtu
Other Gas $1,622,009 1,109,298
MMBtu
TOTAL YEARLY COSTS $3,047,743
RECOMMENDED SAVINGS* $5,243,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $11,344 $4,184 - - $11,344
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,649 $4,909 $5,295
82,732
kWh
$354
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $833 $781 $602
9,404
kWh
$231
-
kW-mo/yr
- - - -
04 2.1336: Install equipment to utilize waste fuel $2,277,853 $9,581,351 - - $(-480,715.0)
-
MMBtu
$575,330
-
MMBtu
$(-166,632.0) $2,349,870
05 2.6212: Turn off equipment during breaks, reduce operating time $6,255 $8,951 $6,192
96,708
kWh
$63
-
kW-mo/yr
- - - -
06 2.1224: Replace boiler $133,316 $376,143 - - $133,316
-
MMBtu
- - -
07 2.7135: Install occupancy sensors $2,756 $391 $2,401
37,516
kWh
$355
-
kW-mo/yr
- - - -
08 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $371,239 $1,219,094 $342,137
5,345,883
kWh
$23,537
-
kW-mo/yr
- - $(-112,263.5) $117,829
09 2.4239: Eliminate or reduce compressed air usage $688 $63 $301
4,702
kWh
$387
-
kW-mo/yr
- - - -
10 2.4322: Use or replace with energy efficient substitutes $62,936 $159,045 $56,748
886,690
kWh
$6,188
-
kW-mo/yr
- - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $74,545 $10,174 $68,756
1,074,313
kWh
$5,789
-
kW-mo/yr
- - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $1,159 $1,170
18,282
kWh
$80
-
kW-mo/yr
- - - -
13 2.9141: Install anaerobic digester $2,295,176 $9,930,710 - - $(-469,548.0)
-
MMBtu
$583,224
-
MMBtu
$(-168,370.0) $2,349,870
TOTAL RECOMMENDED $5,243,838 $21,296,954 $483,601
7,556,230
kWh
$36,982
-
kW-mo/yr
$(-805,602.8)
-
MMBtu
$1,158,554
-
MMBtu
$(-447,265.5) $4,817,569
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs