Assessment Year | 2025 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 66 |
Plant Area |
3,090,929
ft2
|
Annual Production | 7,304,850
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $954,069 | 14,919,671 |
kWh
|
$0.064 |
Electricity Demand | $92,857 | 28,892 |
kW-mo/yr
|
$3.21 |
Electricity Fees | $229,530 | - |
|
- |
Natural Gas | $149,278 | 13,150 |
MMBtu
|
$11.35 |
Other Gas | $1,622,009 | 1,109,298 |
MMBtu
|
$1.46 |
TOTAL YEARLY COSTS | $3,047,743 | |||
RECOMMENDED SAVINGS* | $5,243,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $11,344 | $4,184 | - | - |
$11,344
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,649 | $4,909 |
$5,295
82,732
kWh
|
$354
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $833 | $781 |
$602
9,404
kWh
|
$231
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1336: Install equipment to utilize waste fuel | $2,277,853 | $9,581,351 | - | - |
$(-480,715.0)
-
MMBtu
|
$575,330
-
MMBtu
|
$(-166,632.0) | $2,349,870 | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,255 | $8,951 |
$6,192
96,708
kWh
|
$63
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1224: Replace boiler | $133,316 | $376,143 | - | - |
$133,316
-
MMBtu
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $2,756 | $391 |
$2,401
37,516
kWh
|
$355
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $371,239 | $1,219,094 |
$342,137
5,345,883
kWh
|
$23,537
-
kW-mo/yr
|
- | - | $(-112,263.5) | $117,829 | |
09 | 2.4239: Eliminate or reduce compressed air usage | $688 | $63 |
$301
4,702
kWh
|
$387
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $62,936 | $159,045 |
$56,748
886,690
kWh
|
$6,188
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $74,545 | $10,174 |
$68,756
1,074,313
kWh
|
$5,789
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,250 | $1,159 |
$1,170
18,282
kWh
|
$80
-
kW-mo/yr
|
- | - | - | - | |
13 | 2.9141: Install anaerobic digester | $2,295,176 | $9,930,710 | - | - |
$(-469,548.0)
-
MMBtu
|
$583,224
-
MMBtu
|
$(-168,370.0) | $2,349,870 | |
TOTAL RECOMMENDED | $5,243,838 | $21,296,954 |
$483,601
7,556,230
kWh
|
$36,982
-
kW-mo/yr
|
$(-805,602.8)
-
MMBtu
|
$1,158,554
-
MMBtu
|
$(-447,265.5) | $4,817,569 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs