ITAC Assessment: TT0200
ITAC logo
ITAC Assessment: TT0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Body sub-assemblies for vehicles
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 374
Plant Area 269,060
ft2
Annual Production 650,000
units
Production Hrs. Annual 6,360
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,298 11,020,010
kWh
Electricity Demand $202,004 24,655
kW-mo/yr
Natural Gas $26,911 6,762
MMBtu
TOTAL YEARLY COSTS $623,213
RECOMMENDED SAVINGS* $38,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,941 $3,050 $9,941
277,692
kWh
- -
02 2.7261: Install timers and/or thermostats $9,558 $46,250 $9,806
273,917
kWh
- $(-248.0)
-
MMBtu
03 2.2437: Recover waste heat from equipment $6,931 $15,000 - - $6,931
-
MMBtu
04 2.4226: Use / purchase optimum sized compressor $3,952 $15,000 $3,952
110,400
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,708 $63 $2,823
78,861
kWh
$885
-
kW-mo/yr
-
06 2.6212: Turn off equipment during breaks, reduce operating time $2,216 $7,500 $2,216
61,896
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,772 $1,000 $1,349
37,668
kWh
$423
-
kW-mo/yr
-
TOTAL RECOMMENDED $38,078 $87,863 $30,087
840,434
kWh
$1,308
-
kW-mo/yr
$6,683
-
MMBtu
TOTAL IMPLEMENTED $11,330 $47,250 $11,155
311,585
kWh
$423
-
kW-mo/yr
$(-248.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs