ITAC Assessment: LT0128
ITAC logo
ITAC Assessment: LT0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PRESTRESSED CONCRETE
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 9,000
pieces
Production Hrs. Annual 5,935
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,296 125,440
kWh
Natural Gas $47,235 11,158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,210 $600 - $2,210
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $5,334 $2,500 - $5,334
-
MMBtu
-
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $476 $350 - $476
-
MMBtu
-
04 2.2511: Insulate bare equipment $5,670 $11,000 - $5,160
-
MMBtu
$510
05 2.2135: Repair and eliminate steam leaks $315 $550 - $315
-
MMBtu
-
06 2.6212: Turn off equipment during breaks, reduce operating time $339 $600 $339
7,913
kWh
- -
07 2.4133: Use most efficient type of electric motors $68 $180 $68
586
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $176 - $176
879
kWh
- -
09 2.7261: Install timers and/or thermostats $177 $150 $177
4,103
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $49 $210
3,224
kWh
- $(-15.0)
TOTAL RECOMMENDED $14,960 $15,979 $970
16,705
kWh
$13,495
-
MMBtu
$495
TOTAL IMPLEMENTED $9,222 $4,799 $902
16,119
kWh
$8,335
-
MMBtu
$(-15.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs