Assessment Year | 1988 |
---|---|
Principal Product | PRESTRESSED CONCRETE |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 9,000
pieces
|
Production Hrs. Annual | 5,935
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $14,296 | 125,440 |
kWh
|
$0.11 |
Natural Gas | $47,235 | 11,158 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,222 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,210 | $600 | - |
$2,210
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $5,334 | $2,500 | - |
$5,334
-
MMBtu
|
- | |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $476 | $350 | - |
$476
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $5,670 | $11,000 | - |
$5,160
-
MMBtu
|
$510 | |
05 | 2.2135: Repair and eliminate steam leaks | $315 | $550 | - |
$315
-
MMBtu
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $339 | $600 |
$339
7,913
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $68 | $180 |
$68
586
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $176 | - |
$176
879
kWh
|
- | - | |
09 | 2.7261: Install timers and/or thermostats | $177 | $150 |
$177
4,103
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $195 | $49 |
$210
3,224
kWh
|
- | $(-15.0) | |
TOTAL RECOMMENDED | $14,960 | $15,979 |
$970
16,705
kWh
|
$13,495
-
MMBtu
|
$495 | ||
TOTAL IMPLEMENTED | $9,222 | $4,799 |
$902
16,119
kWh
|
$8,335
-