Assessment Year | 2017 |
---|---|
Principal Product | Automotive Shocks and Struts |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 480 |
Plant Area |
400,000
ft2
|
Annual Production | 18,200,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,792,821 | 32,456,900 |
kWh
|
$0.055 | |
Electricity Demand | $70,906 | 13,511 |
kW-mo/yr
|
$5.25 | |
Natural Gas | $375,623 | 110,637 |
MMBtu
|
$3.40 | |
Waste Disposal Costs | |||||
Water Usage | $85,744 | 34,942 |
Tgal
|
$2.45 | |
Water Disposal | $168,995 | 952,600 |
Tgal
|
$0.18 | |
TOTAL YEARLY COSTS | $2,494,089 | ||||
RECOMMENDED SAVINGS* | $230,974 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $188,217 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $175,487 | $344,898 |
$146,852
2,670,098
kWh
|
$1,833
-
kW-mo/yr
|
- | - | $26,802 | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $12,730 | $18,400 | - | - |
$12,730
-
MMBtu
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $7,986 | $5,250 |
$5,252
95,786
kWh
|
- |
$2,734
-
MMBtu
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,492 | $11,000 |
$5,377
97,756
kWh
|
$2,115
-
kW-mo/yr
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $7,432 | $9,000 |
$7,432
135,125
kWh
|
- | - | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,000 | $20,000 | - | - |
$7,000
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,001 | $3,000 |
$6,001
109,113
kWh
|
- | - | - | - | |
08 | 2.7233: Use properly designed and sized hvac equipment | $3,741 | $8,000 |
$541
9,836
kWh
|
- | - | - | $3,200 | |
09 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,309 | $10,000 | - | - |
$2,119
-
MMBtu
|
$190
-
Tgal
|
- | |
10 | 2.4151: Develop a repair/replace policy | $796 | $1,453 |
$640
11,634
kWh
|
$156
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $230,974 | $431,001 |
$172,095
3,129,348
kWh
|
$4,104
-
kW-mo/yr
|
$24,583
-
MMBtu
|
$190
-
Tgal
|
$30,002 | ||
TOTAL IMPLEMENTED | $188,217 | $363,298 |
$146,852
2,670,098
kWh
|
$1,833
-
kW-mo/yr
|
$12,730
-
MMBtu
|
- | $26,802 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |