ITAC Assessment: TT0191
ITAC logo
ITAC Assessment: TT0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Axle Assemblies
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $100
M
to 500
M
# of Employees 134
Plant Area 103,000
ft2
Annual Production 96,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,964 998,400
kWh
Electricity Demand $23,154 2,513
kW-mo/yr
Natural Gas $7,012 853
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $30,000 315,640
lb
TOTAL YEARLY COSTS $136,130
RECOMMENDED SAVINGS* $45,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.1191: Change procedures / equipment / operating conditions $33,156 $94,000 - - - $33,156
-
lb
02 2.6218: Turn off equipment when not in use $4,274 $3,000 $4,274
56,160
kWh
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,861 $10,500 $2,510
32,980
kWh
- $1,351
-
MMBtu
-
04 2.7135: Install occupancy sensors $3,453 $8,274 $3,411
44,822
kWh
$42
-
kW-mo/yr
- -
05 2.7261: Install timers and/or thermostats $1,175 $250 $634
8,333
kWh
- $541
-
MMBtu
-
TOTAL RECOMMENDED $45,919 $116,024 $10,829
142,295
kWh
$42
-
kW-mo/yr
$1,892
-
MMBtu
$33,156
-
lb
TOTAL IMPLEMENTED $37,784 $102,524 $4,045
53,155
kWh
$42
-
kW-mo/yr
$541
-
MMBtu
$33,156
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs