ITAC Assessment: AR0150
ITAC logo
ITAC Assessment: AR0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Women's Shoes
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area 40,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,120 798,359
kWh
Electricity Demand $11,469 3,359
kW-mo/yr
Natural Gas $7,340 1,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $200 $70 n/a $163
2,345
kWh
$37
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $142 $150 n/a $110
1,465
kWh
$32
-
kW-mo/yr
- - -
03 2.7245: Use direct air supply to exhaust hoods $2,608 $4,328 n/a $1,093
16,413
kWh
- $1,515
-
MMBtu
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $145 - n/a $113
1,465
kWh
$32
-
kW-mo/yr
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $6,888 $8,000 n/a $(-112.0)
(-1,465)
kWh
$(-34.0)
-
kW-mo/yr
- $8,220
-
lb
$(-1,186.0)
06 4.514: Re-arrange equipment layout to reduce handling costs $16,835 $6,400 n/a - - - - $16,835
07 3.2176: Increase use of automation $9,110 $1,500 n/a - - - - $9,110
TOTAL RECOMMENDED $35,928 $20,448 $1,367
20,223
kWh
$67
-
kW-mo/yr
$1,515
-
MMBtu
$8,220
-
lb
$24,759
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs