ITAC Assessment: GT0832
ITAC logo
ITAC Assessment: GT0832
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Frozen Food
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 208,000
ft2
Annual Production 95,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,578,449 28,142,440
kWh
Electricity Demand $430 27
kW-mo/yr
Electricity Fees $91 -
Natural Gas $605,892 49,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,160 $1,250 $12,160
196
kWh
- -
02 2.4314: Use synthetic lubricant $6,843 - $6,843
110,542
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,559 $45,000 $14,559
235,210
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $21,105 - - $22,755
-
MMBtu
$(-1,650.0)
05 2.8112: Combine utility meters $7,574 $14,018 - - $7,574
06 2.2425: Use flue gases to heat process or service water $40,180 $30,000 - $40,180
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $43,862 $20,449 $43,862
708,600
kWh
- -
08 2.8114: Change rate schedules or other changes in utility service $11,830 $36,750 - - $11,830
09 2.4133: Use most efficient type of electric motors $8,862 $47,168 $8,862
143,162
kWh
- -
TOTAL RECOMMENDED $166,975 $194,635 $86,286
1,197,710
kWh
$62,935
-
MMBtu
$17,754
TOTAL IMPLEMENTED $100,548 $113,867 $79,443
1,087,168
kWh
$22,755
-
MMBtu
$(-1,650.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs