ITAC Assessment: NT0005
ITAC logo
ITAC Assessment: NT0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Pork Rinds & Cracklings
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 50,000
ft2
Annual Production 17,407,260
lb
Production Hrs. Annual 5,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,214 1,986,200
kWh
Electricity Demand $45,164 3,728
kW-mo/yr
Electricity Fees $5,106 -
Natural Gas $213,362 20,797
MMBtu
Waste Disposal Costs
Water Usage $28,753 2,338
Tgal
TOTAL YEARLY COSTS $421,599
RECOMMENDED SAVINGS* $856,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,885 $1,258 - - $6,885
-
MMBtu
-
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $6,240 - $1,672
25,728
kWh
$4,568
-
kW-mo/yr
- -
03 3.1191: Change procedures / equipment / operating conditions $832,000 $100,000 - - - $832,000
04 2.7425: Clean or color roof to reduce solar load $4,375 $6,539 $2,065
31,742
kWh
$2,310
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $4,433 $9,008 - $4,433
-
kW-mo/yr
- -
06 2.7221: Lower temperature during the winter season and vice-versa $2,810 - $2,810
43,235
kWh
- - -
TOTAL RECOMMENDED $856,744 $116,805 $6,548
100,705
kWh
$11,311
-
kW-mo/yr
$6,885
-
MMBtu
$832,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs