Assessment Year | 2016 |
---|---|
Principal Product | Medical Implants |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
32,000
ft2
|
Annual Production | 267,464
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,559 | 3,327,600 |
kWh
|
$0.060 |
Electricity Demand | $103,421 | 9,788 |
kW-mo/yr
|
$10.57 |
Natural Gas | $3,412 | 445 |
MMBtu
|
$7.66 |
TOTAL YEARLY COSTS | $307,392 | |||
RECOMMENDED SAVINGS* | $32,119 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,211 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,880 | $54,314 |
$9,260
154,340
kWh
|
$284
-
kW-mo/yr
|
- | $2,336 | |
02 | 2.6218: Turn off equipment when not in use | $6,035 | - |
$6,035
100,586
kWh
|
- | - | - | |
03 | 2.4235: Remove or close off unneeded compressed air lines | $5,391 | - |
$5,391
89,856
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,217 | - |
$4,217
70,297
kWh
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $1,568 | $4,800 |
$1,568
26,130
kWh
|
- | - | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,325 | - | - | - |
$1,325
-
MMBtu
|
- | |
07 | 2.4224: Upgrade controls on compressors | $802 | $2,000 |
$802
13,362
kWh
|
- | - | - | |
08 | 2.4151: Develop a repair/replace policy | $415 | $1,064 |
$320
5,335
kWh
|
$95
-
kW-mo/yr
|
- | - | |
09 | 2.4113: Install motor voltage controller on lightly loaded motors | $319 | $421 |
$319
5,323
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $167 | $195 |
$80
1,328
kWh
|
$2
-
kW-mo/yr
|
- | $85 | |
TOTAL RECOMMENDED | $32,119 | $62,794 |
$27,992
466,557
kWh
|
$381
-
kW-mo/yr
|
$1,325
-
MMBtu
|
$2,421 | ||
TOTAL IMPLEMENTED | $17,211 | $4,800 |
$17,211
286,869
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |