ITAC Assessment: TT0179
ITAC logo
ITAC Assessment: TT0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Medical Implants
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 32,000
ft2
Annual Production 267,464
units
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,559 3,327,600
kWh
Electricity Demand $103,421 9,788
kW-mo/yr
Natural Gas $3,412 445
MMBtu
TOTAL YEARLY COSTS $307,392
RECOMMENDED SAVINGS* $32,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,880 $54,314 $9,260
154,340
kWh
$284
-
kW-mo/yr
- $2,336
02 2.6218: Turn off equipment when not in use $6,035 - $6,035
100,586
kWh
- - -
03 2.4235: Remove or close off unneeded compressed air lines $5,391 - $5,391
89,856
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,217 - $4,217
70,297
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $1,568 $4,800 $1,568
26,130
kWh
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $1,325 - - - $1,325
-
MMBtu
-
07 2.4224: Upgrade controls on compressors $802 $2,000 $802
13,362
kWh
- - -
08 2.4151: Develop a repair/replace policy $415 $1,064 $320
5,335
kWh
$95
-
kW-mo/yr
- -
09 2.4113: Install motor voltage controller on lightly loaded motors $319 $421 $319
5,323
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $167 $195 $80
1,328
kWh
$2
-
kW-mo/yr
- $85
TOTAL RECOMMENDED $32,119 $62,794 $27,992
466,557
kWh
$381
-
kW-mo/yr
$1,325
-
MMBtu
$2,421
TOTAL IMPLEMENTED $17,211 $4,800 $17,211
286,869
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs