ITAC Assessment: TT0172
ITAC logo
ITAC Assessment: TT0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Brake and Fuel Lines
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 160,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 8,064
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,688 9,532,800
kWh
Electricity Demand $331,221 26,945
kW-mo/yr
Natural Gas $72,031 7,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,170 $114,000 $33,980
557,000
kWh
$10,190
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $27,275 $393 $21,375
350,400
kWh
$5,900
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $11,196 $25,500 $11,196
183,540
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,632 $2,000 - - - $3,632
05 2.7261: Install timers and/or thermostats $2,023 $1,000 $954
15,641
kWh
- $1,069
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,611 $3,000 $1,611
26,410
kWh
- - -
TOTAL RECOMMENDED $89,907 $145,893 $69,116
1,132,991
kWh
$16,090
-
kW-mo/yr
$1,069
-
MMBtu
$3,632
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings