ITAC Assessment: OK0599
ITAC logo
ITAC Assessment: OK0599
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Prefabricated piping systems
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 8,100
ton
Production Hrs. Annual 2,574
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,951 2,691,090
kWh
Electricity Fees $2,934 -
Natural Gas $62,517 23,817
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $542,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8112: Combine utility meters $15,427 $10,600 - - - $15,427 -
02 2.7135: Install occupancy sensors $777 $3,841 $777
16,413
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,866 $1,300 $6,866
166,764
kWh
- - - -
04 2.2442: Preheat combustion air with waste heat $6,139 $12,800 - $6,139
-
MMBtu
- - -
05 3.5311: Recover and reuse waste material $89,040 - - - - - $89,040
06 4.112: Replace old machine with new automatic multi-station tool $200,000 $300,000 - - $200,000 - -
07 4.214: Purchase appropriately sized material $224,052 $150 - - $224,052 - -
TOTAL RECOMMENDED $542,301 $328,691 $7,643
183,177
kWh
$6,139
-
MMBtu
$424,052 $15,427 $89,040
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs