Assessment Year | 2000 |
---|---|
Principal Product | Prefabricated piping systems |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
100,000
ft2
|
Annual Production | 8,100
ton
|
Production Hrs. Annual | 2,574
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,951 | 2,691,090 |
kWh
|
$0.046 |
Electricity Fees | $2,934 | - |
|
- |
Natural Gas | $62,517 | 23,817 |
MMBtu
|
$2.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $542,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $15,427 | $10,600 | - | - | - | $15,427 | - | |
02 | 2.7135: Install occupancy sensors | $777 | $3,841 |
$777
16,413
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,866 | $1,300 |
$6,866
166,764
kWh
|
- | - | - | - | |
04 | 2.2442: Preheat combustion air with waste heat | $6,139 | $12,800 | - |
$6,139
-
MMBtu
|
- | - | - | |
05 | 3.5311: Recover and reuse waste material | $89,040 | - | - | - | - | - | $89,040 | |
06 | 4.112: Replace old machine with new automatic multi-station tool | $200,000 | $300,000 | - | - | $200,000 | - | - | |
07 | 4.214: Purchase appropriately sized material | $224,052 | $150 | - | - | $224,052 | - | - | |
TOTAL RECOMMENDED | $542,301 | $328,691 |
$7,643
183,177
kWh
|
$6,139
-
MMBtu
|
$424,052 | $15,427 | $89,040 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs