Assessment Year | 2014 |
---|---|
Principal Product | canned drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 140 |
Plant Area |
167,862
ft2
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $231,452 | 4,948,856 |
kWh
|
$0.047 |
Electricity Demand | $100,547 | 14,364 |
kW-mo/yr
|
$7.00 |
Natural Gas | $29,420 | 17,461 |
MMBtu
|
$1.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,534 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4157: Establish a predictive maintenance program | $442 | - |
$50
1,054
kWh
|
$392
-
kW-mo/yr
|
- | - | |
02 | 2.7122: Disconnect ballasts | $76 | - |
$63
1,340
kWh
|
$13
-
kW-mo/yr
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $3,131 | $800 |
$3,131
66,607
kWh
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $899 | $300 |
$735
15,634
kWh
|
$164
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $88 | $90 |
$38
804
kWh
|
$8
-
kW-mo/yr
|
- | $42 | |
06 | 2.4239: Eliminate or reduce compressed air usage | $354 | $500 |
$354
7,532
kWh
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $6,063 | $18,225 | - | - | $6,063 | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,143 | $8,000 |
$5,143
109,433
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $16,195 | $27,915 |
$9,513
202,404
kWh
|
$577
-
kW-mo/yr
|
$6,063 | $42 | ||
TOTAL IMPLEMENTED | $10,534 | $19,915 |
$4,257
90,577
kWh
|
$172
-
kW-mo/yr
|
$6,063 | $42 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs