Assessment Year | 2014 |
---|---|
Principal Product | Headrests and Armrests |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2396: Automotive Trimmings, Apparel Findings, and Related Products |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
185,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $344,329 | 5,724,404 |
kWh
|
$0.060 |
Electricity Demand | $149,073 | 11,555 |
kW-mo/yr
|
$12.90 |
Natural Gas | $39,478 | 13,912 |
MMBtu
|
$2.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,185 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7122: Disconnect ballasts | $293 | - |
$226
3,775
kWh
|
$67
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125 | $180 |
$97
1,608
kWh
|
$28
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $1,294 | $1,550 |
$1,294
21,565
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,860 | $15,980 |
$5,429
90,478
kWh
|
$2,431
-
kW-mo/yr
|
- | |
05 | 2.4157: Establish a predictive maintenance program | $14,016 | $23,710 |
$897
14,958
kWh
|
$13,119
-
kW-mo/yr
|
- | |
06 | 2.4237: Substitute compressed air cooling with water or air cooling | $598 | $2,350 |
$598
9,960
kWh
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,636 | $18,000 |
$4,636
77,174
kWh
|
- | - | |
08 | 2.7226: Use computer programs to optimize hvac performance | $15,563 | $110,000 |
$12,880
214,669
kWh
|
$481
-
kW-mo/yr
|
$2,202
-
MMBtu
|
|
TOTAL RECOMMENDED | $44,384 | $171,770 |
$26,056
434,187
kWh
|
$16,126
-
kW-mo/yr
|
$2,202
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,185 | $43,770 |
$8,540
142,344
kWh
|
$15,645
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs