ITAC Assessment: KS2313
ITAC logo
ITAC Assessment: KS2313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Tufted Broadloom Carpet
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 550,000
ft2
Annual Production 6,306,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,292,046 14,518,267
kWh
Natural Gas $545,538 62,451
MMBtu
Waste Disposal Costs
Water Usage $19,367 2,850
Tgal
Water Disposal $20,294 2,850
Tgal
TOTAL YEARLY COSTS $1,877,245
RECOMMENDED SAVINGS* $237,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,149 $29,920 $24,149
271,341
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,937 $60 $1,937
21,765
kWh
- -
03 2.2136: Install / repair insulation on steam lines $28,388 $6,340 - $28,388
-
MMBtu
-
04 2.8112: Combine utility meters $11,545 $33,000 - - $11,545
05 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $106,263 $627,000 $149,520
1,680,000
kWh
$(-36,857.0)
-
MMBtu
$(-6,400.0)
06 2.9114: Use solar heat to make electricty $65,144 $514,950 $65,144
731,960
kWh
- -
TOTAL RECOMMENDED $237,426 $1,211,270 $240,750
2,705,066
kWh
$(-8,469.0)
-
MMBtu
$5,145
TOTAL IMPLEMENTED $37,631 $62,980 $26,086
293,106
kWh
- $11,545
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs