Assessment Year | 2023 |
---|---|
Principal Product | Tufted Broadloom Carpet |
NAICS | 314110: Carpet and Rug Mills |
SIC | 2273: Carpets and Rugs |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
550,000
ft2
|
Annual Production | 6,306,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,292,046 | 14,518,267 |
kWh
|
$0.089 | |
Natural Gas | $545,538 | 62,451 |
MMBtu
|
$8.74 | |
Waste Disposal Costs | |||||
Water Usage | $19,367 | 2,850 |
Tgal
|
$6.80 | |
Water Disposal | $20,294 | 2,850 |
Tgal
|
$7.12 | |
TOTAL YEARLY COSTS | $1,877,245 | ||||
RECOMMENDED SAVINGS* | $237,426 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $37,631 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,149 | $29,920 |
$24,149
271,341
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,937 | $60 |
$1,937
21,765
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $28,388 | $6,340 | - |
$28,388
-
MMBtu
|
- | |
04 | 2.8112: Combine utility meters | $11,545 | $33,000 | - | - | $11,545 | |
05 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $106,263 | $627,000 |
$149,520
1,680,000
kWh
|
$(-36,857.0)
-
MMBtu
|
$(-6,400.0) | |
06 | 2.9114: Use solar heat to make electricty | $65,144 | $514,950 |
$65,144
731,960
kWh
|
- | - | |
TOTAL RECOMMENDED | $237,426 | $1,211,270 |
$240,750
2,705,066
kWh
|
$(-8,469.0)
-
MMBtu
|
$5,145 | ||
TOTAL IMPLEMENTED | $37,631 | $62,980 |
$26,086
293,106
kWh
|
- | $11,545 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs