Assessment Year | 2011 |
---|---|
Principal Product | Automotive Seating |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 269 |
Plant Area |
200,000
ft2
|
Annual Production | 184,564
pieces
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $168,289 | 3,481,920 |
kWh
|
$0.048 |
Electricity Demand | $112,543 | 9,367 |
kW-mo/yr
|
$12.01 |
Electricity Fees | $5,051 | - |
|
- |
Natural Gas | $32,608 | 7,815 |
MMBtu
|
$4.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,986 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7122: Disconnect ballasts | $508 | - |
$508
10,512
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $336 | - |
$336
6,865
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $205 | - |
$205
4,284
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $1,618 | - |
$1,618
33,500
kWh
|
- | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $631 | - |
$631
13,065
kWh
|
- | |
06 | 2.4157: Establish a predictive maintenance program | $1,937 | - |
$1,937
40,100
kWh
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $5,691 | - |
$1,393
27,039
kWh
|
$4,298
-
MMBtu
|
|
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,584 | - |
$4,584
94,911
kWh
|
- | |
TOTAL RECOMMENDED | $15,510 | - |
$11,212
230,276
kWh
|
$4,298
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,986 | - |
$2,986
61,761
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs