ITAC Assessment: AR0054
ITAC logo
ITAC Assessment: AR0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Vanadium Chemicals
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area 250,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,048
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $621,507 11,690,504
kWh
Natural Gas $596,046 243,606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $13,281 $1,000 - $13,281
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $2,889 $400 $2,889
29,601
kWh
-
03 2.4133: Use most efficient type of electric motors $5,741 $9,240 $5,741
55,100
kWh
-
04 2.2135: Repair and eliminate steam leaks $7,194 $1,000 - $7,194
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,687 $885 $5,687
99,062
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,514 $1,109 $11,514
126,905
kWh
-
TOTAL RECOMMENDED $46,306 $13,634 $25,831
310,668
kWh
$20,475
-
MMBtu
TOTAL IMPLEMENTED $46,306 $13,634 $25,831
310,668
kWh
$20,475
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs