ITAC Assessment: LE0345
ITAC logo
ITAC Assessment: LE0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Woven Narrow Fabrics
NAICS 313220: Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 104,730
ft2
Annual Production 78,000,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,720 497,100
kWh
Electricity Demand $12,716 2,564
kW-mo/yr
Electricity Fees $3,948 -
Natural Gas $0.1 0
MMBtu
Fuel Oil #4 $284,966 13,161
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $340,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $320,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.7232: Replace existing hvac unit with high efficiency model $737 $2,800 $639
6,795
kWh
$98
-
kW-mo/yr
- - -
02 2.2135: Repair and eliminate steam leaks $16,178 $750 - - - - $16,178
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,658 $550 $1,435
15,262
kWh
$223
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,195 $6,750 $1,841
19,584
kWh
$286
-
kW-mo/yr
$68 - -
05 2.2136: Install / repair insulation on steam lines $21,763 $3,800 - - - - $21,763
-
MMBtu
06 2.7261: Install timers and/or thermostats $6,352 $575 $766
8,148
kWh
- - - $5,586
-
MMBtu
07 2.1224: Replace boiler $226,873 $560,000 - - - $(-58,063.0)
-
MMBtu
$284,936
-
MMBtu
08 2.2444: Use hot process fluids to preheat incoming process fluids $2,858 $12,810 - - - - $2,858
-
MMBtu
09 2.2444: Use hot process fluids to preheat incoming process fluids $3,306 $3,800 - - - - $3,306
-
MMBtu
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,720 $7,500 $4,120
43,829
kWh
$600
-
kW-mo/yr
- - -
11 2.2136: Install / repair insulation on steam lines $53,742 $3,200 - - - - $53,742
-
MMBtu
TOTAL RECOMMENDED $340,382 $602,535 $8,800
93,618
kWh
$1,207
-
kW-mo/yr
$68 $(-58,063.0)
-
MMBtu
$388,369
-
MMBtu
TOTAL IMPLEMENTED $320,214 $568,300 $1,435
15,262
kWh
$223
-
kW-mo/yr
- $(-58,063.0)
-
MMBtu
$376,619
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs