ITAC Assessment: HO0226
ITAC logo
ITAC Assessment: HO0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cut-up Poultry
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 75,000
ft2
Annual Production 53,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,085 4,282,239
kWh
Electricity Demand $112,670 11,798
kW-mo/yr
LPG $3,803 5,112
MMBtu
Fuel Oil #2 $149,243 42,547
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4226: Use / purchase optimum sized compressor $281 $1,500 $281
6,741
kWh
- - -
02 2.2135: Repair and eliminate steam leaks $7,450 $400 - $7,450
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $2,224 $4,350 - $2,224
-
MMBtu
- -
04 3.7121: Improve handling practices $3,900 $4,000 - - - $3,900
05 4.425: Eliminate/reduce redundant inspections $3,900 $1,260 - - - $3,900
06 4.423: Move product using mechanical means $645 $225 - - - $645
07 4.423: Move product using mechanical means $780 $650 - - - $780
08 3.4151: Minimize water usage $20,966 $2,000 - - $20,966
-
Tgal
-
TOTAL RECOMMENDED $40,146 $14,385 $281
6,741
kWh
$9,674
-
MMBtu
$20,966
-
Tgal
$9,225
TOTAL IMPLEMENTED $8,230 $1,050 - $7,450
-
MMBtu
- $780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs