Assessment Year | 2011 |
---|---|
Principal Product | Conveyor Assemblies |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $50 M to 100M |
# of Employees | 530 |
Plant Area |
600,000
ft2
|
Annual Production | 54,432
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,882 | 10,509,800 |
kWh
|
$0.046 |
Natural Gas | $369,849 | 41,548 |
MMBtu
|
$8.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,245 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,235 | - |
$4,235
91,480
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $7,025 | $2,100 | - |
$7,025
-
MMBtu
|
- | |
03 | 2.4224: Upgrade controls on compressors | $1,990 | $1,600 |
$1,990
43,000
kWh
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $875 | $1,200 |
$875
18,900
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,337 | $21,600 |
$11,337
244,860
kWh
|
- | - | |
06 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,730 | $4,900 |
$1,730
37,609
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $6,582 | $32,600 | - | - | $6,582 | |
08 | 2.7425: Clean or color roof to reduce solar load | $11,486 | $102,000 |
$11,486
247,689
kWh
|
- | - | |
09 | 2.4151: Develop a repair/replace policy | $5,985 | $1,347 |
$5,985
129,267
kWh
|
- | - | |
TOTAL RECOMMENDED | $51,245 | $167,347 |
$37,638
812,805
kWh
|
$7,025
-
MMBtu
|
$6,582 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs