| Assessment Year | 2011 |
|---|---|
| Principal Product | Conveyor Assemblies |
| NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 530 |
| Plant Area |
600,000
ft2
|
| Annual Production | 54,432
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $486,882 | 10,509,800 |
kWh
|
$0.046 |
| Natural Gas | $369,849 | 41,548 |
MMBtu
|
$8.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,245 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,235 | - |
$4,235
91,480
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $7,025 | $2,100 | - |
$7,025
-
MMBtu
|
- | |
| 03 | 2.4224: Upgrade controls on compressors | $1,990 | $1,600 |
$1,990
43,000
kWh
|
- | - | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $875 | $1,200 |
$875
18,900
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,337 | $21,600 |
$11,337
244,860
kWh
|
- | - | |
| 06 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,730 | $4,900 |
$1,730
37,609
kWh
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $6,582 | $32,600 | - | - | $6,582 | |
| 08 | 2.7425: Clean or color roof to reduce solar load | $11,486 | $102,000 |
$11,486
247,689
kWh
|
- | - | |
| 09 | 2.4151: Develop a repair/replace policy | $5,985 | $1,347 |
$5,985
129,267
kWh
|
- | - | |
| TOTAL RECOMMENDED | $51,245 | $167,347 |
$37,638
812,805
kWh
|
$7,025
-
MMBtu
|
$6,582 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs