ITAC Assessment: TS0022
ITAC logo
ITAC Assessment: TS0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POLYURETHANE FOAM PRODUC
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area
n/a
Annual Production 114,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,014 3,915,885
kWh
Natural Gas $137,799 32,343
MMBtu
Fuel Oil #2 $10,500 2,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,270 $5,000 - $6,270
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $595 - $595
12,603
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,325 $480 $5,325
113,716
kWh
-
04 2.6232: Install set-back timers $2,580 $1,000 $2,580
55,100
kWh
-
05 2.7446: Utilize sensors controlling roof and wall openings $10,224 $3,000 - $10,224
-
MMBtu
TOTAL RECOMMENDED $24,994 $9,480 $8,500
181,419
kWh
$16,494
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs