Assessment Year | 2022 |
---|---|
Principal Product | Malt Beverages |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
888,600
ft2
|
Annual Production | 60,000,000
units
|
Production Hrs. Annual | 3,750
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $884,025 | 20,897,400 |
kWh
|
$0.042 | |
Electricity Demand | $2,368,513 | 13,620 |
kW-mo/yr
|
$173.90 | |
Electricity Fees | $716,321 | - |
|
- | |
Natural Gas | $886,895 | 115,514 |
MMBtu
|
$7.68 | |
Waste Disposal Costs | |||||
Water Usage | $300,171 | 55,935 |
Tgal
|
$5.37 | |
TOTAL YEARLY COSTS | $5,155,925 | ||||
RECOMMENDED SAVINGS* | $3,149,727 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $3,095,633 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $1,450,229 | $9,600 | - | - | - | $1,450,229 | - | |
02 | 3.5316: Contract a wood pallet recycling company | $1,386,000 | $40,297 | - | - | - | - | $1,386,000 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,960 | $18,000 |
$47,960
1,141,898
kWh
|
- | - | - | - | |
04 | 3.4151: Minimize water usage | $27,045 | $300,000 | - | - |
$27,045
-
Tgal
|
- | - | |
05 | 3.4151: Minimize water usage | $6,134 | $40,000 |
$(-3,525.0)
(-83,925)
kWh
|
- |
$9,659
-
Tgal
|
- | - | |
06 | 2.9141: Install anaerobic digester | $232,359 | $1,128,000 | - |
$232,359
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $3,149,727 | $1,535,897 |
$44,435
1,057,973
kWh
|
$232,359
-
MMBtu
|
$36,704
-
Tgal
|
$1,450,229 | $1,386,000 | ||
TOTAL IMPLEMENTED | $3,095,633 | $1,477,897 | - |
$232,359
-
MMBtu
|
$27,045
-
Tgal
|
$1,450,229 | $1,386,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs