ITAC Assessment: TS0021
ITAC logo
ITAC Assessment: TS0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CONFECTIONARY GOODS
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,719 2,125,147
kWh
Natural Gas $65,346 15,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $844 $326 $844
20,223
kWh
-
02 2.6232: Install set-back timers $624 $700 $624
14,947
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,093 $4,800 - $3,093
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $633 $300 - $633
-
MMBtu
05 2.6218: Turn off equipment when not in use $3,178 $150 - $3,178
-
MMBtu
TOTAL RECOMMENDED $8,372 $6,276 $1,468
35,170
kWh
$6,904
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs