Assessment Year | 1999 |
---|---|
Principal Product | Tempered Glass |
NAICS |
n/a
|
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $10 M to 50M |
# of Employees | 106 |
Plant Area |
80,000
ft2
|
Annual Production | 3,000
thousand feet
|
Production Hrs. Annual | 7,752
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $286,088 | 4,916,764 |
kWh
|
$0.058 |
Electricity Demand | $144,577 | 11,380 |
kW-mo/yr
|
$12.70 |
Natural Gas | $1,421 | 210 |
MMBtu
|
$6.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,906,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,539,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,293 | $3,150 |
$5,451
93,787
kWh
|
$1,842
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,834 | $3,195 |
$8,120
139,508
kWh
|
$2,743
-
kW-mo/yr
|
$(-4,029.0)
-
MMBtu
|
- | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $769 | $466 |
$575
9,965
kWh
|
$194
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,740 | $1,817 |
$2,048
35,170
kWh
|
$692
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $88,190 | $133,150 |
$65,919
1,132,767
kWh
|
$22,271
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,802 | $14,510 |
$6,514
111,958
kWh
|
$2,288
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.5313: Increase amount of waste recovered for resale | $1,413 | - | - | - | - |
$1,413
-
lb
|
- | - | |
08 | 4.126: Install sensors to detect defects | $821,093 | $48,500 | - | - | - | - | $821,093 | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $131,976 | $10,000 | - | - | - | - | $131,976 | - | |
10 | 4.424: Improve space comfort conditioning | $574,512 | $43,227 | - | - | - | - | $55,812 | $518,700 | |
11 | 2.8114: Change rate schedules or other changes in utility service | $54,584 | $130,000 | - | - | - | - | $54,584 | - | |
12 | 2.3192: Use fossil fuel powered generator during peak demand periods | $110,720 | $322,185 |
$202,990
3,488,570
kWh
|
$68,580
-
kW-mo/yr
|
$(-160,850.0)
-
MMBtu
|
- | - | - | |
13 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $97,553 | $950,000 |
$90,218
1,550,410
kWh
|
$30,480
-
kW-mo/yr
|
$(-23,145.0)
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $1,906,479 | $1,660,200 |
$381,835
6,562,135
kWh
|
$129,090
-
kW-mo/yr
|
$(-188,024.0)
-
MMBtu
|
$1,413
-
lb
|
$1,063,465 | $518,700 | ||
TOTAL IMPLEMENTED | $1,539,027 | $106,694 |
$7,499
128,957
kWh
|
$2,534
-
kW-mo/yr
|
- |
$1,413
-
lb
|
$1,008,881 | $518,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs