Assessment Year | 2004 |
---|---|
Principal Product | Window Sash Balances |
NAICS | 332321: Metal Window and Door Manufacturing |
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
60,000
ft2
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 4,394
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,000 | 1,357,540 |
kWh
|
$0.035 |
Electricity Demand | $29,165 | 3,744 |
kW-mo/yr
|
$7.79 |
Natural Gas | $40,054 | 5,564 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,866 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,450 | $439 |
$908
26,192
kWh
|
$542
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $155 | $312 |
$98
2,824
kWh
|
$57
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $487 | $40 |
$304
8,788
kWh
|
$183
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $950 | $557 | - | - |
$950
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $21 | $11 |
$13
369
kWh
|
$8
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $603 | $444 |
$377
10,885
kWh
|
$226
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $673 | $1,641 |
$420
12,129
kWh
|
$253
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $527 | $599 |
$527
15,243
kWh
|
- | - | |
TOTAL RECOMMENDED | $4,866 | $4,043 |
$2,647
76,430
kWh
|
$1,269
-
kW-mo/yr
|
$950
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,511 | $1,491 |
$1,602
46,234
kWh
|
$959
-
kW-mo/yr
|
$950
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |