Assessment Year | 1984 |
---|---|
Principal Product | SAFETY AND RELIEF VALVES |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,850 | 1,710,141 |
kWh
|
$0.047 |
Natural Gas | $28,650 | 6,590 |
MMBtu
|
$4.35 |
Fuel Oil #2 | $18,138 | 2,953 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,244 | $500 | - |
$3,294
-
MMBtu
|
- | $(-50.0) | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $246 | - |
$94
2,052
kWh
|
$152
-
MMBtu
|
- | - | |
03 | 2.1332: Convert combustion equipment to burn natural gas | $10,415 | - | - |
$(-11,435.0)
-
MMBtu
|
$21,850
-
MMBtu
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $677 | $2,376 | - |
$677
-
MMBtu
|
- | - | |
05 | 2.7441: Replace broken windows and/or window sash | $217 | - | - |
$217
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $242 | $500 |
$242
5,275
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $481 | $800 |
$481
10,258
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $15,522 | $4,176 |
$817
17,585
kWh
|
$(-7,095.0)
-
MMBtu
|
$21,850
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs