ITAC Assessment: TS0011
ITAC logo
ITAC Assessment: TS0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product SAFETY AND RELIEF VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,850 1,710,141
kWh
Natural Gas $28,650 6,590
MMBtu
Fuel Oil #2 $18,138 2,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,244 $500 - $3,294
-
MMBtu
- $(-50.0)
02 2.7221: Lower temperature during the winter season and vice-versa $246 - $94
2,052
kWh
$152
-
MMBtu
- -
03 2.1332: Convert combustion equipment to burn natural gas $10,415 - - $(-11,435.0)
-
MMBtu
$21,850
-
MMBtu
-
04 2.7492: Use proper thickness of insulation on building envelope $677 $2,376 - $677
-
MMBtu
- -
05 2.7441: Replace broken windows and/or window sash $217 - - $217
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $242 $500 $242
5,275
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $481 $800 $481
10,258
kWh
- - -
TOTAL RECOMMENDED $15,522 $4,176 $817
17,585
kWh
$(-7,095.0)
-
MMBtu
$21,850
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs