ITAC Assessment: TS0009
ITAC logo
ITAC Assessment: TS0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FOOD HANDLING EQUIPMENT
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 191
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,431 5,500,879
kWh
Natural Gas $187,684 45,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2711: Utilize outside air instead of conditioned air for drying $14,940 $8,000 - $14,940
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $111 $10 $111
2,931
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,498 - $3,498
87,339
kWh
-
04 2.7442: Keep doors and windows shut when not on use $2,460 $1,200 - $2,460
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $400 - $400
9,965
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $581 $600 $581
14,654
kWh
-
TOTAL RECOMMENDED $21,990 $9,810 $4,590
114,889
kWh
$17,400
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs