ITAC Assessment: AM0795
ITAC logo
ITAC Assessment: AM0795
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Clothing
NAICS 323113: Commercial Screen Printing
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 83,000
ft2
Annual Production 350,000
units
Production Hrs. Annual 5,928
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,205 1,546,320
kWh
Electricity Demand $65,179 5,271
kW-mo/yr
Electricity Fees $2,697 -
Natural Gas $1,511 154
MMBtu
TOTAL YEARLY COSTS $134,592
RECOMMENDED SAVINGS* $8,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $3,600 $35 $3,600
85,630
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,426 $1,000 $1,369
34,220
kWh
$57
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,710 $18 $1,100
26,171
kWh
$610
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $710 $284 $391
9,769
kWh
$249
-
kW-mo/yr
- $70
05 2.8123: Pay utility bills on time $1,105 - - - $1,105 -
TOTAL RECOMMENDED $8,551 $1,337 $6,460
155,790
kWh
$916
-
kW-mo/yr
$1,105 $70
TOTAL IMPLEMENTED $6,131 $1,035 $4,969
119,850
kWh
$57
-
kW-mo/yr
$1,105 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs