ITAC Assessment: TN0694
ITAC logo
ITAC Assessment: TN0694
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product laboratory refrigerators, freezers, incubators
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 435
Plant Area 267,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,942 7,664,713
kWh
Electricity Demand $164,115 14,588
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $287,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings Primary Product Savings
01 4.721: Initiate a program to acquire iso certification $219,860 $100,000 - - $5,110 $2,250
-
Tgal
- - $212,500
02 2.7131: Add area lighting switches $17,510 $25,030 $17,510
286,049
kWh
- - - - - -
03 2.4151: Develop a repair/replace policy $10,755 $5,075 $3,365
105,217
kWh
$2,295
-
kW-mo/yr
- - - - $5,095
04 2.7251: Reduce air conditioning load by evaporating water from roof $10,130 $181,580 $13,470
220,106
kWh
- - - - $(-3,340.0)
-
Tgal
-
05 2.3212: Optimize plant power factor $8,665 $26,260 - - $8,665 - - - -
06 2.3191: Use demand controller or load shedder $6,210 $18,900 - $6,210
-
kW-mo/yr
- - - - -
07 3.6112: Use filter and drying oven to reduce sludge volume $4,345 $9,100 - - - - $4,345
-
lb
- -
08 3.8142: Distill contaminated solvents for reuse $3,600 $7,000 - - - - $3,600
-
lb
- -
09 2.7144: Install spectral reflectors / delamp $2,795 $1,875 $1,595
49,824
kWh
$1,080
-
kW-mo/yr
- - $120
-
lb
- -
10 2.2614: Use cooling tower or economizer to replace chiller cooling $2,185 $3,570 $1,465
45,721
kWh
$720
-
kW-mo/yr
- - - - -
11 2.6218: Turn off equipment when not in use $1,365 - $1,365
22,274
kWh
- - - - - -
TOTAL RECOMMENDED $287,420 $378,390 $38,770
729,191
kWh
$10,305
-
kW-mo/yr
$13,775 $2,250
-
Tgal
$8,065
-
lb
$(-3,340.0)
-
Tgal
$217,595
TOTAL IMPLEMENTED $29,630 $30,105 $22,240
413,540
kWh
$2,295
-
kW-mo/yr
- - - - $5,095
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs