| Assessment Year | 2000 |
|---|---|
| Principal Product | laboratory refrigerators, freezers, incubators |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 435 |
| Plant Area |
267,000
ft2
|
| Annual Production | 25,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $227,942 | 7,664,713 |
kWh
|
$0.030 |
| Electricity Demand | $164,115 | 14,588 |
kW-mo/yr
|
$11.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $287,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,630 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Water Consumption Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.721: Initiate a program to acquire iso certification | $219,860 | $100,000 | - | - | $5,110 |
$2,250
-
Tgal
|
- | - | $212,500 | |
| 02 | 2.7131: Add area lighting switches | $17,510 | $25,030 |
$17,510
286,049
kWh
|
- | - | - | - | - | - | |
| 03 | 2.4151: Develop a repair/replace policy | $10,755 | $5,075 |
$3,365
105,217
kWh
|
$2,295
-
kW-mo/yr
|
- | - | - | - | $5,095 | |
| 04 | 2.7251: Reduce air conditioning load by evaporating water from roof | $10,130 | $181,580 |
$13,470
220,106
kWh
|
- | - | - | - |
$(-3,340.0)
-
Tgal
|
- | |
| 05 | 2.3212: Optimize plant power factor | $8,665 | $26,260 | - | - | $8,665 | - | - | - | - | |
| 06 | 2.3191: Use demand controller or load shedder | $6,210 | $18,900 | - |
$6,210
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 3.6112: Use filter and drying oven to reduce sludge volume | $4,345 | $9,100 | - | - | - | - |
$4,345
-
lb
|
- | - | |
| 08 | 3.8142: Distill contaminated solvents for reuse | $3,600 | $7,000 | - | - | - | - |
$3,600
-
lb
|
- | - | |
| 09 | 2.7144: Install spectral reflectors / delamp | $2,795 | $1,875 |
$1,595
49,824
kWh
|
$1,080
-
kW-mo/yr
|
- | - |
$120
-
lb
|
- | - | |
| 10 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,185 | $3,570 |
$1,465
45,721
kWh
|
$720
-
kW-mo/yr
|
- | - | - | - | - | |
| 11 | 2.6218: Turn off equipment when not in use | $1,365 | - |
$1,365
22,274
kWh
|
- | - | - | - | - | - | |
| TOTAL RECOMMENDED | $287,420 | $378,390 |
$38,770
729,191
kWh
|
$10,305
-
kW-mo/yr
|
$13,775 |
$2,250
-
Tgal
|
$8,065
-
lb
|
$(-3,340.0)
-
Tgal
|
$217,595 | ||
| TOTAL IMPLEMENTED | $29,630 | $30,105 |
$22,240
413,540
kWh
|
$2,295
-
kW-mo/yr
|
- | - | - | - | $5,095 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Water Consumption Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs