ITAC Assessment: MA0849
ITAC logo
ITAC Assessment: MA0849
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 3
Plant Area 10,000
ft2
Annual Production 1,460,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,478 1,822,724
kWh
Electricity Demand $70,203 3,800
kW-mo/yr
Electricity Fees $9,120 -
LPG $2,917 204
MMBtu
TOTAL YEARLY COSTS $288,718
RECOMMENDED SAVINGS* $880,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $786,360 $8,384,740 $429,193
3,798,169
kWh
$33,829
-
kW-mo/yr
$323,338 -
02 2.7273: Install desiccant humidity control system $53,317 $27,882 $(-5,464.0)
(-48,355)
kWh
$(-1,219.0)
-
kW-mo/yr
- $60,000
03 2.7234: Use heat pump for space conditioning $22,535 $8,016 $18,415
162,965
kWh
$4,120
-
kW-mo/yr
- -
04 2.7234: Use heat pump for space conditioning $9,331 $2,100 $5,562
49,224
kWh
$3,769
-
kW-mo/yr
- -
05 2.7234: Use heat pump for space conditioning $8,491 $10,020 $5,165
45,708
kWh
$3,326
-
kW-mo/yr
- -
TOTAL RECOMMENDED $880,034 $8,432,758 $452,871
4,007,711
kWh
$43,825
-
kW-mo/yr
$323,338 $60,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs