ITAC Assessment: DS0137
ITAC logo
ITAC Assessment: DS0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Egg Cartons
NAICS
n/a
SIC 2646:
Sales Range $5
M
to 10
M
# of Employees 76
Plant Area 51,600
ft2
Annual Production 140,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,452 6,315,651
kWh
Electricity Demand $98,222 10,236
kW-mo/yr
Electricity Fees $4,717 -
Natural Gas $250,770 87,567
MMBtu
LPG $5,755 342
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $5,161 $572
33,705
kWh
$910
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,120 $375 $625
36,635
kWh
$495
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $10,691 $614 $5,991
352,579
kWh
$4,700
-
kW-mo/yr
- - -
04 4.211: Consider use / purchase of bulk materials where possible $3,151 $3,300 - - - - $3,151
05 2.7313: Recycle air for heating, ventilation and air conditioning $28,136 $65,000 - - $28,136
-
MMBtu
- -
06 4.423: Move product using mechanical means $4,180 $13,250 - - - $4,180 -
07 4.821: Pay bills on time to avoid late fees $308 - - - - - $308
TOTAL RECOMMENDED $49,068 $87,700 $7,188
422,919
kWh
$6,105
-
kW-mo/yr
$28,136
-
MMBtu
$4,180 $3,459
TOTAL IMPLEMENTED $43,768 $74,075 $6,563
386,284
kWh
$5,610
-
kW-mo/yr
$28,136
-
MMBtu
- $3,459
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs