ITAC Assessment: LE0436
ITAC logo
ITAC Assessment: LE0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Perforated Metal
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 135,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,968
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,440 3,891,600
kWh
Electricity Demand $24,737 9,870
kW-mo/yr
Electricity Fees $26,217 -
Natural Gas $40,240 7,300
MMBtu
TOTAL YEARLY COSTS $339,634
RECOMMENDED SAVINGS* $72,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,786 $1,000 $5,229
81,718
kWh
$557
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,929 $15,805 $14,045
219,458
kWh
$884
-
kW-mo/yr
-
03 2.6212: Turn off equipment during breaks, reduce operating time $6,297 $7,000 $5,679
88,737
kWh
$618
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,174 $3,600 $2,928
45,744
kWh
$246
-
kW-mo/yr
-
05 2.7233: Use properly designed and sized hvac equipment $23,395 $32,000 - - $23,395
-
MMBtu
06 2.4226: Use / purchase optimum sized compressor $2,358 $7,000 $3,168
49,504
kWh
- $(-810.0)
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $513 $1,683 $423
6,612
kWh
$90
-
kW-mo/yr
-
08 2.4226: Use / purchase optimum sized compressor $16,120 $63,000 $15,101
235,955
kWh
$1,019
-
kW-mo/yr
-
TOTAL RECOMMENDED $72,572 $131,088 $46,573
727,728
kWh
$3,414
-
kW-mo/yr
$22,585
-
MMBtu
TOTAL IMPLEMENTED $24,402 $22,088 $22,625
353,532
kWh
$1,777
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs