ITAC Assessment: TN0687
ITAC logo
ITAC Assessment: TN0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product transformers
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 260,000
ft2
Annual Production 1,902
pieces
Production Hrs. Annual 4,845
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,598 1,970,985
kWh
Electricity Demand $34,947 5,522
kW-mo/yr
Natural Gas $35,778 7,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $25,255 $1,075 $880
9,672
kWh
- - - - $24,375
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,703 $750 $6,447
137,163
kWh
$256
-
kW-mo/yr
- - - -
03 3.4113: Treat and reuse rinse waters $6,496 $14,340 - - - $916
-
Tgal
$5,580
-
gal
-
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,210 $820 - - - - $4,210
-
gal
-
05 2.7444: Close holes and openings in building such as broken windows $3,280 $2,925 $3,280
135,404
kWh
- - - - -
06 2.7261: Install timers and/or thermostats $2,289 $2,150 $320
6,741
kWh
- $1,969
-
MMBtu
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,680 $350 $1,000
36,928
kWh
$680
-
kW-mo/yr
- - - -
08 2.2511: Insulate bare equipment $1,562 $188 - - $1,562
-
MMBtu
- - -
09 2.2449: Recover heat from exhausted steam, hot air or hot water $893 $2,950 - - $893
-
MMBtu
- - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $720 - $420
15,533
kWh
$300
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $53,088 $25,548 $12,347
341,441
kWh
$1,236
-
kW-mo/yr
$4,424
-
MMBtu
$916
-
Tgal
$9,790
-
gal
$24,375
TOTAL IMPLEMENTED $40,857 $5,145 $9,067
206,037
kWh
$1,236
-
kW-mo/yr
$1,969
-
MMBtu
- $4,210
-
gal
$24,375
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs