Assessment Year | 1996 |
---|---|
Principal Product | Electric and Gas Ranges |
NAICS |
n/a
|
SIC | 3631: Household Cooking Equipment |
Sales Range | $100 M to 500M |
# of Employees | 1,100 |
Plant Area |
430,000
ft2
|
Annual Production | 750,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $549,375 | 20,940,211 |
kWh
|
$0.026 |
Electricity Demand | $148,712 | 41,465 |
kW-mo/yr
|
$3.59 |
Natural Gas | $837,905 | 248,173 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $34,060 | $12,880 |
$20,390
927,022
kWh
|
- |
$13,670
-
MMBtu
|
- | - | - | - | |
02 | 3.5316: Contract a wood pallet recycling company | $33,550 | $15,600 | - | - | - | - |
$5,750
-
lb
|
$27,800 | - | |
03 | 2.2511: Insulate bare equipment | $9,770 | $5,400 | - | - |
$9,770
-
MMBtu
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,230 | $7,525 |
$3,330
151,231
kWh
|
$3,900
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,660 | $480 |
$1,600
73,271
kWh
|
$3,060
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,920 | $4,450 | - | - |
$2,920
-
MMBtu
|
- | - | - | - | |
07 | 3.7212: Improved material handling (mixing and transfer) | $2,600 | - | - | - | - | - |
$2,275
-
lb
|
$325 | - | |
08 | 3.3128: Utilize other methods to remove contaminants | $1,600 | $930 | - | - | - |
$(-200.0)
-
gal
|
- | $2,700 | $(-900.0) | |
TOTAL RECOMMENDED | $96,390 | $47,265 |
$25,320
1,151,524
kWh
|
$6,960
-
kW-mo/yr
|
$26,360
-
MMBtu
|
$(-200.0)
-
gal
|
$8,025
-
lb
|
$30,825 | $(-900.0) | ||
TOTAL IMPLEMENTED | $53,660 | $25,805 |
$23,720
1,078,253
kWh
|
$3,900
-
kW-mo/yr
|
$23,440
-
MMBtu
|
- |
$2,275
-
lb
|
$325 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Primary Raw Material Savings |