ITAC Assessment: TN0595
ITAC logo
ITAC Assessment: TN0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric and Gas Ranges
NAICS
n/a
SIC 3631: Household Cooking Equipment
Sales Range $100
M
to 500
M
# of Employees 1,100
Plant Area 430,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,375 20,940,211
kWh
Electricity Demand $148,712 41,465
kW-mo/yr
Natural Gas $837,905 248,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7261: Install timers and/or thermostats $34,060 $12,880 $20,390
927,022
kWh
- $13,670
-
MMBtu
- - - -
02 3.5316: Contract a wood pallet recycling company $33,550 $15,600 - - - - $5,750
-
lb
$27,800 -
03 2.2511: Insulate bare equipment $9,770 $5,400 - - $9,770
-
MMBtu
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,230 $7,525 $3,330
151,231
kWh
$3,900
-
kW-mo/yr
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $4,660 $480 $1,600
73,271
kWh
$3,060
-
kW-mo/yr
- - - - -
06 2.2437: Recover waste heat from equipment $2,920 $4,450 - - $2,920
-
MMBtu
- - - -
07 3.7212: Improved material handling (mixing and transfer) $2,600 - - - - - $2,275
-
lb
$325 -
08 3.3128: Utilize other methods to remove contaminants $1,600 $930 - - - $(-200.0)
-
gal
- $2,700 $(-900.0)
TOTAL RECOMMENDED $96,390 $47,265 $25,320
1,151,524
kWh
$6,960
-
kW-mo/yr
$26,360
-
MMBtu
$(-200.0)
-
gal
$8,025
-
lb
$30,825 $(-900.0)
TOTAL IMPLEMENTED $53,660 $25,805 $23,720
1,078,253
kWh
$3,900
-
kW-mo/yr
$23,440
-
MMBtu
- $2,275
-
lb
$325 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs