ITAC Assessment: TT0106
ITAC logo
ITAC Assessment: TT0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Wheel Weights
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 250
Plant Area 150,000
ft2
Annual Production 0
lb
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $752,921 11,764,500
kWh
Electricity Demand $281,758 26,838
kW-mo/yr
Electricity Fees $13,976 -
Natural Gas $99,404 12,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $8,613 $37,637 - $8,613
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $3,063 $720 $2,500
39,062
kWh
$563
-
kW-mo/yr
03 2.7144: Install spectral reflectors / delamp $1,763 $5,520 $1,215
18,987
kWh
$548
-
kW-mo/yr
04 2.7144: Install spectral reflectors / delamp $2,586 $9,280 $1,783
27,867
kWh
$803
-
kW-mo/yr
TOTAL RECOMMENDED $16,025 $53,157 $5,498
85,916
kWh
$10,527
-
kW-mo/yr
TOTAL IMPLEMENTED $3,063 $720 $2,500
39,062
kWh
$563
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs