ITAC Assessment: TN0585
ITAC logo
ITAC Assessment: TN0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cut Felt Parts and Sewn Dryer Seals
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 78,000
ft2
Annual Production 430,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,568 1,177,902
kWh
Electricity Demand $15,804 4,180
kW-mo/yr
LPG $3,266 305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.1182: Make a new by-product $31,813 $50,000 - - - $24,133
-
lb
$(-25,000.0) $(-5,000.0) $37,680
02 2.7144: Install spectral reflectors / delamp $5,531 $16,050 $4,162
83,236
kWh
$777
-
kW-mo/yr
- - - $592 -
03 2.7261: Install timers and/or thermostats $1,905 $1,300 $835
16,706
kWh
- $1,070
-
MMBtu
- - - -
04 3.6192: Use a less expensive method of waste removal $1,575 - - - - $1,575
-
lb
- - -
05 2.4314: Use synthetic lubricant $486 - $322
6,448
kWh
$164
-
kW-mo/yr
- - - - -
06 2.6212: Turn off equipment during breaks, reduce operating time $308 - $308
6,155
kWh
- - - - - -
TOTAL RECOMMENDED $41,618 $67,350 $5,627
112,545
kWh
$941
-
kW-mo/yr
$1,070
-
MMBtu
$25,708
-
lb
$(-25,000.0) $(-4,408.0) $37,680
TOTAL IMPLEMENTED $34,204 $51,300 $1,157
23,154
kWh
$164
-
kW-mo/yr
$1,070
-
MMBtu
$24,133
-
lb
$(-25,000.0) $(-5,000.0) $37,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs