Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product NC Turning and Milling Equipment
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 92,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,019 3,817,702
kWh
Electricity Demand $67,482 6,674
kW-mo/yr
Electricity Fees $3,850 -
LPG $12,510 1,536
MMBtu
Fuel Oil #2 $3,022 671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,872 $44,461 $25,064
358,148
kWh
$5,808
-
kW-mo/yr
- - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,085 $3,826 $4,635
66,237
kWh
$2,756
-
kW-mo/yr
$(-2,306.0)
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,461 $50 $2,461
35,170
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $2,277 $300 $2,277
32,239
kWh
- - - - -
05 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $80,452 $92,000 - - - - $80,452
-
gal
-
06 3.4151: Minimize water usage $1,290 $105 $973
14,068
kWh
- - $144
-
Tgal
- $173
-
Tgal
TOTAL RECOMMENDED $122,437 $140,742 $35,410
505,862
kWh
$8,564
-
kW-mo/yr
$(-2,306.0)
-
MMBtu
$144
-
Tgal
$80,452
-
gal
$173
-
Tgal
TOTAL IMPLEMENTED $85,190 $92,350 $4,738
67,409
kWh
- - - $80,452
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings Water Consumption Savings