ITAC Assessment: TN0566
ITAC logo
ITAC Assessment: TN0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Remanufactured mining equipment
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 65,000
ft2
Annual Production 110
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,659 2,339,390
kWh
Natural Gas $51,221 10,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $5,841 $1,550 $5,841
176,729
kWh
- - -
02 2.7261: Install timers and/or thermostats $2,110 $900 $2,110
105,510
kWh
- - -
03 2.4314: Use synthetic lubricant $349 - $349
6,741
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $260 $540 $260
4,982
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $87 $557
10,551
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,317 - $2,317
-
kWh
- - -
07 3.2121: Convert to electrostatic powder coating $75,665 $27,400 - - - $75,665
-
lb
08 3.5315: Lease / purchase baler; sell cardboard to recycler $25,775 $8,640 - - $25,775
-
lb
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,685 $8,500 - $8,685
-
gal
- -
10 3.7131: Use a rag recycle service $3,345 - - - $3,345
-
lb
-
TOTAL RECOMMENDED $124,904 $47,617 $11,434
304,513
kWh
$8,685
-
gal
$29,120
-
lb
$75,665
-
lb
TOTAL IMPLEMENTED $110,155 $37,677 $8,715
187,280
kWh
- $25,775
-
lb
$75,665
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs