ITAC Assessment: TN0557
ITAC logo
ITAC Assessment: TN0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Icemakers, circuit boards, and bomb fuse cables
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 725
Plant Area 162,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,846 4,871,337
kWh
Natural Gas $11,883 2,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Gaseous Waste Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $7,423 $5,320 $4,836
109,906
kWh
$2,587
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,157 $900 $1,157
21,102
kWh
- - - -
03 2.4314: Use synthetic lubricant $1,030 - $1,030
18,757
kWh
- - - -
04 2.2511: Insulate bare equipment $761 $788 $761
17,292
kWh
- - - -
05 2.6211: Conserve energy by efficient use of vending machines $567 $1,275 $567
12,896
kWh
- - - -
06 3.1191: Change procedures / equipment / operating conditions $27,755 $24,000 - - $19,380
-
gal
$8,375
-
lb
-
07 3.8143: Recycle cleaning solvent and reuse $10,768 $12,400 - - $6,089
-
gal
- $4,679
TOTAL RECOMMENDED $49,461 $44,683 $8,351
179,953
kWh
$2,587
-
MMBtu
$25,469
-
gal
$8,375
-
lb
$4,679
TOTAL IMPLEMENTED $10,371 $7,008 $7,784
167,057
kWh
$2,587
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Gaseous Waste Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs