ITAC Assessment: TN0528
ITAC logo
ITAC Assessment: TN0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Heavy vehicle rebuilt manual transmissions and assorted repl
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 98,000
ft2
Annual Production 9,100
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,077 1,806,858
kWh
Natural Gas $23,728 3,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7261: Install timers and/or thermostats $15,187 $6,700 n/a $8,939
146,542
kWh
$6,248
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,236 $4,060 n/a $3,236
53,048
kWh
- - -
03 2.2511: Insulate bare equipment $1,967 $365 n/a $1,967
32,239
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $858 - n/a $858
14,068
kWh
- - -
05 2.6218: Turn off equipment when not in use $715 - n/a $715
11,723
kWh
- - -
06 2.6231: Utilize controls to operate equipment only when needed $572 $330 n/a $572
9,379
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $375 $275 n/a $375
6,155
kWh
- - -
08 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $5,815 $20,200 n/a - - $5,815
-
gal
-
09 3.5316: Contract a wood pallet recycling company $1,595 - n/a - - - $1,595
-
lb
10 3.7131: Use a rag recycle service $1,448 - n/a - - - $1,448
-
lb
11 3.8314: Purchase high materials in returnable bulk containers $2,500 $7,500 n/a - - - $2,500
-
lb
TOTAL RECOMMENDED $34,268 $39,430 $16,662
273,154
kWh
$6,248
-
MMBtu
$5,815
-
gal
$5,543
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs