Assessment Year | 1994 |
---|---|
Principal Product | Sealants and Adhesives |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $50 M to 100M |
# of Employees | 216 |
Plant Area |
203,500
ft2
|
Annual Production | 210,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $481,008 | 10,936,987 |
kWh
|
$0.044 |
Natural Gas | $122,559 | 22,818 |
MMBtu
|
$5.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,309 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $17,076 | $780 | - |
$17,076
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $6,276 | $585 |
$5,120
116,354
kWh
|
$1,156
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,540 | $1,786 |
$2,540
57,737
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,076 | $480 |
$2,076
47,186
kWh
|
- | |
05 | 2.6218: Turn off equipment when not in use | $1,625 | - |
$1,625
36,928
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,613 | - |
$1,613
36,635
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,548 | $510 |
$1,548
35,170
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $271 | $915 |
$271
6,155
kWh
|
- | |
09 | 2.2511: Insulate bare equipment | $168 | $345 |
$168
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $33,193 | $5,401 |
$14,961
339,975
kWh
|
$18,232
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,309 | $4,486 |
$13,077
297,185
kWh
|
$18,232
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs