ITAC Assessment: IA0036
ITAC logo
ITAC Assessment: IA0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BATHROOM FURNITURE
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,938 535,463
kWh
Natural Gas $20,887 4,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $7,499 $4,050 - $7,499
-
MMBtu
-
02 2.7243: Improve air circulation with destratification fans / other methods $697 $2,520 $(-116.0)
(-2,052)
kWh
$813
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $713 $594 - $713
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,712 $200 $1,712
30,481
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $445 $150 $445
7,913
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $364 - $364
6,448
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $183 $48 $252
4,396
kWh
- $(-69.0)
08 2.7111: Reduce illumination to minimum necessary levels $145 $110 $127
2,345
kWh
- $18
09 2.7224: Reduce space conditioning during non-working hours $75 - - $75
-
MMBtu
-
TOTAL RECOMMENDED $11,833 $7,672 $2,784
49,531
kWh
$9,100
-
MMBtu
$(-51.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs