| Assessment Year | 1992 |
|---|---|
| Principal Product | BATHROOM FURNITURE |
| NAICS |
n/a
|
| SIC | 2519: Household Furniture, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,938 | 535,463 |
kWh
|
$0.056 |
| Natural Gas | $20,887 | 4,603 |
MMBtu
|
$4.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $7,499 | $4,050 | - |
$7,499
-
MMBtu
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $697 | $2,520 |
$(-116.0)
(-2,052)
kWh
|
$813
-
MMBtu
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $713 | $594 | - |
$713
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,712 | $200 |
$1,712
30,481
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $445 | $150 |
$445
7,913
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $364 | - |
$364
6,448
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $183 | $48 |
$252
4,396
kWh
|
- | $(-69.0) | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $145 | $110 |
$127
2,345
kWh
|
- | $18 | |
| 09 | 2.7224: Reduce space conditioning during non-working hours | $75 | - | - |
$75
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $11,833 | $7,672 |
$2,784
49,531
kWh
|
$9,100
-
MMBtu
|
$(-51.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs