| Assessment Year | 1994 |
|---|---|
| Principal Product | Urethane foam cushions |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $10 M to 50M |
| # of Employees | 104 |
| Plant Area |
163,000
ft2
|
| Annual Production | 1,300
ton
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,125 | 2,619,578 |
kWh
|
$0.047 |
| Natural Gas | $114,920 | 17,376 |
MMBtu
|
$6.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,665 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $7,494 | $1,620 |
$1,198
25,498
kWh
|
$6,296
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,681 | $4,140 |
$1,681
35,756
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,198 | $520 |
$1,198
25,498
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,185 | $870 |
$1,185
24,033
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $909 | $221 |
$909
19,343
kWh
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $906 | - |
$906
19,343
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $376 | $65 | - |
$376
-
MMBtu
|
|
| 08 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $21,222 | $16,000 |
$52,910
1,117,819
kWh
|
$(-31,688.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $34,971 | $23,436 |
$59,987
1,267,290
kWh
|
$(-25,016.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,665 | $1,455 |
$3,289
68,874
kWh
|
$376
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs