ITAC Assessment: UD0984
ITAC logo
ITAC Assessment: UD0984
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Powertrain components
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 189
Plant Area 169,970
ft2
Annual Production 6,120,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,440,109 22,610,232
kWh
Natural Gas $629,107 172,588
MMBtu
Waste Disposal Costs
Water Usage $37,541 9,191
Tgal
Water Disposal $37,541 9,191
Tgal
TOTAL YEARLY COSTS $2,144,297
RECOMMENDED SAVINGS* $130,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $2,053 $50 - $2,053
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,981 $14,930 $24,981
390,328
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,566 $1,500 $6,566
102,594
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $852 $750 $852
13,313
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $13,616 $10,000 $13,616
212,750
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,684 - $1,684
26,309
kWh
-
07 2.7231: Use radiant heater for spot heating $42,420 $47,500 - $42,420
-
MMBtu
08 2.4131: Size electric motors for peak operating efficiency $22,981 $69,925 $22,981
359,077
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,474 $11,000 $3,474
54,287
kWh
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,271 $21,975 $12,271
191,738
kWh
-
TOTAL RECOMMENDED $130,898 $177,630 $86,425
1,350,396
kWh
$44,473
-
MMBtu
TOTAL IMPLEMENTED $51,173 $38,180 $51,173
799,581
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs