| Assessment Year | 2003 |
|---|---|
| Principal Product | Manufactures ferrous and nonferrous metal casings |
| NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | $5 M to 10M |
| # of Employees | 90 |
| Plant Area |
33,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,301
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $62,274 | 1,219,933 |
kWh
|
$0.051 |
| Electricity Demand | $16,997 | 6,718 |
kW-mo/yr
|
$2.53 |
| Electricity Fees | $6,915 | - |
|
- |
| Natural Gas | $38,617 | 4,070 |
MMBtu
|
$9.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,686 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,322 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,950 | $30 |
$13,037
217,650
kWh
|
$5,913
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $294 | $30 |
$202
3,401
kWh
|
$92
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $519 | $3,755 |
$354
6,126
kWh
|
$165
-
kW-mo/yr
|
- | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $2,428 | $8,500 |
$1,828
33,783
kWh
|
$600
-
kW-mo/yr
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $216 | $89 |
$207
5,249
kWh
|
$9
-
kW-mo/yr
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $209 | $49 |
$140
2,768
kWh
|
$69
-
kW-mo/yr
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $420 | $3,231 |
$289
4,818
kWh
|
$131
-
kW-mo/yr
|
- | |
| 08 | 4.445: Install equipment to move product | $16,133 | $825 | - | - | $16,133 | |
| 09 | 4.514: Re-arrange equipment layout to reduce handling costs | $15,623 | $5,760 | - | - | $15,623 | |
| 10 | 4.521: Clear and rent existing space | $11,984 | $9,060 | - | - | $11,984 | |
| 11 | 4.514: Re-arrange equipment layout to reduce handling costs | $910 | $960 | - | - | $910 | |
| TOTAL RECOMMENDED | $67,686 | $32,289 |
$16,057
273,795
kWh
|
$6,979
-
kW-mo/yr
|
$44,650 | ||
| TOTAL IMPLEMENTED | $22,322 | $12,423 |
$15,566
265,576
kWh
|
$6,756
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs